Design and Work Measurement Analysis on Line Welding Stand Comp Main Type Kzra to Optimize The Number of Operator (Case Study in PT DP)

Authors

  • Aris Rubianto Universitas Mercu Buana Jakarta
  • Muhammad Kholil Universitas Mercu Buana Jakarta

Abstract

Abstrak

 

PT DP merupakan salah satu perusahaan manufaktur di Indonesia yang bergerak di bidang otomotif, baik roda empat maupun roda dua. Sesuai dengan tujuan perusahaan, maka perusahaan harus siap menghadapi persaingan global dimana setiap industri dituntut untuk menghasilkan produk dengan harga yang kompetitif, kualitas lebih baik, delivery on time, serta proses yang lebih efisien disertai dengan biaya yang rendah. Kondisi sebelum dilakukan perubahan proses, untuk proses produksi Stand Comp Main type KZRA diproduksi secara welding manual sehingga beban pekerjaan operator tinggi yang berpengaruh terhadap fisik dan kualitas barang yang dihasilkan. Metode yang dipakai untuk aktifitas perbaikan adalah line balancing dengan mengganti proses welding manual menjadi robotic sehingga dapat mengurangi beban kerja operator dan menghasilkan kualitas welding yang lebih stabil tanpa mengurangi hasil produksi. Hasil analisis menyatakan bahwa dengan adanya perbaikan pada Line Welding Stand Comp Main type KZRA dapat mengurangi jumlah stasiun kerja menjadi tujuh stasiun kerja dengan tujuh operator, untuk Line Efficiency naik menjadi 96,7%. Nilai efisiensi yang dihasilkan berupa penurunan idle time menjadi 7,5 detik, penurunan balance delay menjadi 3,3%, serta efisiensi biaya berupa cost reduction sejumlah Rp.5.760.000,-/bulan untuk reduce dua orang operator per shift.

 

Kata kunci: produktivitas, efisiensi, line efficiency, idle time, yamazumi

 

 

Abstract

 

PT DP is one of the manufacturing companies in Indonesia engaging in automotive of either four wheels or two wheels. In accordance with the objectives of the company, the company must be prepared to face the global competition, in which each industry is required to produce products with competitive price, better quality, on-time delivery, as well as more-efficient processes and low cost. Conditions prior to the change process are that the production process of Stand Comp Main types of welding KZRA was manual, resulting in high operator workload affecting the physical and quality of the goods produced. The method used for repair activity is line balancing by changing the manual welding with robotic welding process to reduce operator workload and produce a more stable welding quality without reducing yield. Results of the analysis stated that with the improvement on the Line Welding Stand Comp Main type KZRA, the number of work stations can be reduced into 7 work stations with 7 operators, while Line Efficiency rose to 96.7%. The efficiency values results in the decrease of idle time to 7.5 seconds, the decrease of balance delay to 3.3%, and cost reduction of Rp.5.760.000,-/month, i.e. two operator/shift.

   
Keywords: productivity, efficiency, line efficieny, idle time, yamazumi

 

Author Biographies

Aris Rubianto, Universitas Mercu Buana Jakarta

Program Studi Teknik Industri

Muhammad Kholil, Universitas Mercu Buana Jakarta

Program Studi Teknik Industri

Downloads

Published

2016-12-01